Mobile Emergency Backup Power β€” Deploy in 48 Hours

    The emost Butler M provides 150 kVA of mobile emergency power anywhere β€” no grid connection, no permits, no diesel. Ready when you need it most.

    Rapid Deployment

    No permits, no grid application. Delivered and operational within 48 hours to any location.

    Grid-Independent

    Fully autonomous operation. No reliance on damaged or unavailable grid infrastructure.

    Silent Operation

    Zero noise output β€” deploy in residential areas, hospitals, or sensitive environments without disruption.

    Emission-Free

    Safe for enclosed spaces, tunnels, and indoor environments. No exhaust, no ventilation required.

    Proven for Critical Infrastructure

    Deutsche Bahn β€” GSM-R Mast Power Supply

    The emost Butler M was deployed to power Deutsche Bahn's GSM-R communication masts β€” critical infrastructure for railway safety signalling. The Butler provided reliable, grid-independent, emission-free power in remote locations where grid connection was unavailable or impractical, proving its capability for mission-critical applications.

    150 kVA

    Output Power

    48h

    Deployment Time

    0

    Emissions

    Request Emergency Power Consultation

    Typical response within 24 hours. For urgent needs, call +41 76 393 72 41.